- Major demolition of existing structure
- Added a 3-story structure to the rear of the house
- Installed new decks and walkways
- Installed a new heating system servicing the entire structure
|
- Wide-plank cherry flooring on the main floor
- Four roof pitches
- Multiple bumpout windows
- VG fir cabinets with richlite countertop
- Marmoleum flooring
- Built-in cherry cabinets
- New bevel cedar siding and stained cedar shakes
- New deck at rear of property with an overhead trellis
- New large windows enlarging the property’s view of Fishermans’ Terminal
|